Highway Civil Works Projects (1990-1995)
1995
Aetoliko - Astakos - Mitikas Road - Section from Aetolikos to Astakos |
Approved Project Budget: 6.245.048 €
Client: MINISTRY OF P. W. & E.
Commission Date: 1992 & 1995 |
Participation (65%) in the design of all civil works.
The project included:
i) Preliminary design of 2 bridges, 2 underpasses and 2 culverts and ii) Preliminary design of an underpass, 3 bridges 10.0m, 35.0m and 49.0m, a 3x25.0 bridge, a 45.0+80.0+45.0m bridge and a 13.0+21.0+13.0m overpass. |
1. Preza - Pilitsis & Prtns Ltd
2. H. Kotrotsou Tsimonou |
Improvement of National Road Athens-Thessaloniki - Section "Agii Theodori - Almyros" |
Approved Project Budget: 6.412.326 €
Client: MINISTRY OF P. W. & E. / DENCO Ltd
|
Participation (70%). Preliminary design of: 9 culverts, 4 overpasses, bridge 2x31.25+3x32.0m, bridge 2x17.5+3x18.6m, bridge 2x25.0+26.0m, overpass 2x23.0+37.5m, overpass 36.0m and bridge 30.5m. |
1. H. Kotrotsou Tsimonou
2. IPSILON Ltd |
1993
New Railway line Athens - Thessaloniki |
Approved Project Budget: 79.236.977 €
Client: HELLENIC ORGANIZATION OF RAILWAYS S.A. / DENCO Ltd
|
Participation (20%) in the preliminary and the final design of 13 bridges (7 underpasses of span 11.50m / 4 bridges, 2 of which have a span of 27.0m while the rest have a span of 60.0m / and 2 railway bridges, 1 of 27.0m span and 1 of 60.0m). |
1992
Deviation of Corinth |
Approved Project Budget: 1.980.924 €
Client: MINISTRY OF P. W. & E. /
ODOMECHANIKI Ltd |
Participation (35%) in the final design of a bridge (span 34.0+52.0+34.0m) (T31) at chainage 0+780.40 of the road 4Α, at section Ksiria creek – A. Corinth. |
|
Approved Project Budget: 1.863.536 €
Client: MINISTRY OF P. W. & E. /
ODOMECHANIKI Ltd |
Participation (35%) in the final design of a bridge (span 43.0+53.0+38.0m) (T54) at chainage 0+164.69 of the road Π8, at section Kira Brisi - Ksiria creek. |
1991
Preliminary design of structures at the intersection of the National Road with Acharnon Road |
Approved Project Budget: 3.844.461 €
Client: MINISTRY OF P. W. & E. |
Branch 2: Bridge of 7 spans, total length 225.0m
Branch 4: Bridge of 3 spans, total length 93.0m
Subway of 4.50x2.70m cross-section |
1990
Athens-Lamia Highway - Section Mpogiati-Malakasa |
Approved Project Budget: 2.785.033 €
Client: HELLENIC ORGANIZATION OF RAILWAYS S.A./ ΟDOMECHANIKI Ltd
Approved Project Budget: 1990-1991 |
Participation (25%) in the final design of a railway bridge (span 28.0-35.0-35.0-28.0m) at chainage 3+836.65. |
|