Highway Civil Works Projects (1996-1999)

1999

 

Egnatia Highway - Mesovounio Bridge

Approved Project Budget: 4.695.525 €

Client: EGNATIA ODOS S.A. / ΜECHANIKI S.A. - DENCO Ltd

Participation (50%) in final design of Mesovounio Bridge, 4-span, total length 260.0m, box-type section. Cantilever construction method.

 

1998

 

Egnatia Highway - Section 13.6

Approved Project Budget: 1.975.055 €

Client: EGNATIA ODOS S.A. / T.E.B. S.A.

Final design of a 3-span bridge, total length 73.0m (10.0+35.0+19.0), box-type prestressed section, on pile foundation, in section 13.6 at chainage 10+790.46 of Egnatia Highway.

 

Egnatia Highway - Section 13.6

Approved Project Budget: 1.358.767 €

Client: EGNATIA ODOS S.A. / T.E.B. S.A.

Final design of a 3-span Bridge, total length 80.0m (21.0+31.0+28.0), box-type prestressed section, in section 13.6 at chainage 10+057.46 of Egnatia Highway.

 

Egnatia Highway - Section 13.5

Approved Project Budget: 1.960.382 €

Client: EGNATIA ODOS S.A. / T.E.B. S.A.

Final design of a 3-span Bridge, total length 103.36m (34.19+34.98+34.19), in section 13.5 at chainage 1+100 of Egnatia Highway, consisting of precast, prestressed beams 34.50m long.

 

Egnatia Highway - Bridge on River Compsatos (Section 14.3)

Approved Project Budget: 11.140.132 €

Client: EGNATIA ODOS S.A.

Final design of a bridge on river Compsatos, with 13 spans and total length 416.0m, consisting of precast, prestressed beams at chainage 12+837 in section 14.3 of Egnatia Highway.

 

PATHE Highway - Junction "Efessou - Diou"

Approved Project Budget: 431.401 €

Client: MINISTRY OF P. W. & E. / Τ.Ε.Β. S.A.

Final design of the bridge on Helopotamos river, with a span of 33.0m at chainage 2+009.64, on the side road of the railroad line to Efessou Diou Crossing.

 

Egnatia Highway - Sections 16.5 & 13.6

Approved Project Budget: 1.906.958 €

Client: EGNATIA ODOS S.A. / T.E.B. S.A.

Final design of fourteen (14) small structures, retaining walls and rain storm structures in sections 16.5 & 13.6 Egnatia Highway.

 

Egnatia Highway - Sections 13.5 & 13.8

Approved Project Budget: 1.919.363 €

Client: EGNATIA ODOS S.A. / T.E.B. S.A.

Final design of 6 under-pass crossing structures of span 7.0-15.0m in sections 13.5 & 13.8, of Egnatia Highway at chainages 7+105.50 and from 12+589.35 to 15+068.28.

 

PATHE Highway - Junction "Efessou - Diou"

Approved Project Budget: 469.552 €

Client: MINISTRY OF P. W. & E. / Τ.Ε.Β. S.A.

Final design of a prestressed bridge, 32.0m long (2x16.0m) at chainage 2+518.22, of the side road from the railroad line to Efessou Diou Crossing.

 

Approved Project Budget: 586.941 €

Client: MINISTRY OF P. W. & E. / Τ.Ε.Β. S.A.

Final design of the prestressed bridge on Vathyras River, with a span 5x9.5m, at chainage 0+337.20, on the side road of the old railroad line from 7th to Efessou Diou Crossing.

 

Egnatia Highway - Section 13.5

Approved Project Budget: 7.545.121 €

Client: EGNATIA ODOS S.A. / T.E.B. S.A.

Final design of a Cut & Cover tunnel, of total length 230.0m, in section 13.5 of Egnatia Highway, at chainage 9+590 to 9+820.

 

1997

 

Railway Bridge in the Corinth Isthmus

Approved Project Budget: 6.118.855 €

Client: HELLENIC ORGANIZATION OF RAILWAYS S.A. / ΟDOMECHANIKI

Participation (20%) in the final design of the 3-span railway bridge in the Corinth Isthmus. Total bridge length 230.0m (60.0+110.0+60.0), prestressed simple cell box type section. Constructed with the balanced cantilever method.

 

PATHE Highway - Junction "Efessou - Diou"

Approved Project Budget: 4.026.412 €

Client: MINISTRY OF P. W. & E. / Τ.Ε.Β. S.A.

Final design of all civil works for the overpass Junction "Efessou - Diou" PATHE Highway, Section "Dion - Katerini" at chainage 19+000 to 26+800. The project included a 5-span bridge 153.0m long (30.0+3x31.0+30.0), 2 simple span bridges 14.0m long and all approach works.

 

1996

 

Hydroelectric Plant of Thesauros-Nestos

Approved Project Budget: 504.769 €

Client: PUBLIC POWER CORPORATION / Τ.Ε.Β. S.A.

Final design of a 21.0m span bridge to reestablish access to Sidironero and Papades.

 

PATHE Highway - Section Aerino Megalo Monastiri

Approved Project Budget: 742.480 €

Client: MINISTRY OF P. W. & E. / DENCO Ltd

Participation (50%) in the final design of an overpass bridge 96.0m long (26.0+44.0+26.0).

 

Bridge at Velestino junction

Approved Project Budget: 495.965 €

Client: MINISTRY OF P. W. & E. / DENCO Ltd

Participation (50%) in the final design of a bridge at Velestino junction, 21.90m span.

 