Highway Civil Works Projects (2000-2004)

2004

 

PATHE Highway - Section "Deviation of Kamena Vourla"

Approved Project Budget: 39.450.000 €

Client: MINISTRY OF P. W. & E. / PATHE HIGHWAY / J/V AEGEK - EFKLIDES

Design of all civil works at chainage 11+300 to 14+520.

The project includes 2 Cut & Cover tunnels, underpasses, bridges, retaining walls etc

 

PATHE Highway - Section "Deviation of Kamena Vourla"

Approved Project Budget: 22.170.000 €

Client: MINISTRY OF P. W. & E. / PATHE HIGHWAY / PROODEFTIKI S.A.

Design of all civil works at chainage 14+520 to 20+240.

The projects included Cut & Cover tunnels, underpasses, bridges, retaining walls.

 

Corinth - Patra railway line renovation

Approved Project Budget: 2.410.000 €

Client: ERGOSE S.A. / OBERMEYER HELLAS Ltd

Preliminary design of a curved overpass-bridge at chainage 76+907 near Patra, between chainage 75.0 to 90.0 km. Total length 167.50m, 5 spans (28.0+38.0+43.5+34.0+24.0), constructed in separate phases with pile foundation.

 

Egnatia Highway - Panagia Junction

Approved Project Budget: 855.000 €

Client: EGNATIA ODOS S.A.

Final design of a curved overpass bridge at Panagia junction km 5+920 in Egnatia Highway. Three spans, total length 90.0m (25.0+40.0+25.0), prestressed box section.

 

2002

 

Egnatia Highway - Section Krystallopigi - Psilorachi

Approved Project Budget: 20.542.920 €

Client: EGNATIA ODOS S.A.

Final design of bridge Γ4 in section 1.1.6 of Egnatia Highway. Total length 220.0m (57.0+106.0+57.0)

Cantilever construction method.

 

Egnatia Highway - Section Siatista - Raches

Approved Project Budget: 42.360.000 €

Client: EGNATIA ODOS S.A.

Preliminary design of all the civil works in section "Siatista - Raches" at chainage 0+000 to 10+300 of Egnatia Highway (Part 45.1.1 Siatista - Krystalopigi). The project includes one valley bridge 120.0m long, precast, prestressed beam construction, 3 overpasses and 4 underpasses.

 

2001

 

Egnatia Highway - Section Lefkopetra - Kouloura

Approved Project Budget: 5.282.465 €

Client: EGNATIA ODOS S.A. / JOINT VENTURE FOR THE CONSTRUCTION OF SECTION VERIA -LEFKOPETRA - SITE A1 ASOMATA

Final design of 2 - span bridge Γ1, total length 155.0m, bridge section: box-type section of road: Lefkopetra - Kouloura of Egnatia Highway. Cantilever construction method.

 

Egnatia Highway - Section Lefkopetra - Kouloura

Approved Project Budget: 5.884.079 €

Client: EGNATIA ODOS S.A. / JOINT VENTURE FOR THE CONSTRUCTION OF SECTION VERIA -LEFKOPETRA - SITE A1 ASOMATA

Final design of 2 - span bridge Γ2, total length 166.0m, bridge section: box-type section of road: Lefkopetra - Kouloura of Egnatia Highway. Cantilever construction method.

 

Corinth Isthmus Railway Bridge - Railway line Athens - Corinth

Approved Project Budget: 7.710.476 €

Client: HELLENIC ORGANIZATION OF RAILWAYS S.A. / ODOMECHANIKI

Revision of the superstructure final design of the Corinth Isthmus Railway Bridge, total length 230.0m (60.0+110.0+60.0), single cell prestressed box. Cantilever construction Method.

 

Egnatia Highway - Kavala By-pass

Approved Project Budget: 3.944.391 €

Client:EGNATIA ODOS S.A.

Final design of an underpass crossing of the existing National Road Kavala - Xanthi, at its intersection with Egnatia Highway, at chainage 13+214.16 of section 13.8

 

Athens-Thessaloniki National Road - Section Agii Theodori - Entrance to Almyros

Approved Project Budget: 2.956.485 €

Client: MINISTRY OF P.W. & E. / JOINT VENTURE ΕΤΕP S.A. - ΜΕΤOΝ S.A. - ΒΕΝΤ S.A.

Final design of a 5-span bridge over Platanorema creek (Γ5), total length 91.0m, at chainage 282+778.00

 

2000

 

Egnatia Highway - Section Polymylos - Lefkopetra (5.1)

Approved Project Budget: 8.522.377 €

Client: EGNATIA ODOS S.A. / JOINT VENTURE ΑΤΤΙΚΑΤ S.A. - Κ.Ι. SARANTOPOULOS S.A. - J&P (HELLAS) S.A. - ΤΕGΚ S.A.

Final design of a 3-span bridge Γ8, total length 206.0m, bridge section: box-type, road section: Polymylos - Lefkopetra (5.1) of Egnatia Highway. Cantilever construction method.

 

Athens - Corinth - Patra Railway Line - Section Kakia Skala

Approved Project Budget: 1.374.051 €

Client: ERGOSE S.A. / ODOMECHANIKI

Participation (45%) in the final design of a 3-span railway bridge Γ4Νa, total length 64.0m, section prestressed, single cell box.

 

Athens - Corinth - Patra Railway Line - Section Kakia Skala

Approved Project Budget: 3.074.310 €

Client: ERGOSE S.A. / ODOMECHANIKI

Participation (45%) in the final design of a 6-span bridge Γ5Νa, total length 124.18m, section prestressed, single cell box.

 

 