Highway Civil Works Projects (2005-)
2015
Completion of Afchin Agkathias – Chamezi – Siteia section with an approximate length of 3.8km |
Client: ORGANIZATION FOR THE DEVELOPMENT OF CRETE S.A./ ERGO S.A. – ERGODOMI S.A. – KASTOR S.A. J/V |
Structural design of the Chamezi bridge. |
2014
Motorway Korinth - Patra - Pyrgos - Tsakona. |
Client: APION KLEOS J/V AKTOR S.A. |
Design of technical works, five underpasses, one overpass and many retaining structures near the city of Aegion. |
2013
Highway E80, Section Nis (Prosek) - Dimitrograv, Serbia |
Client: AKTOR S.A. |
Value Engineering & Construction Consultation |
Comarnic - Brasov Motorway - Romania |
Client: Romanian Nat. Co. of Motorways & Nat. Roads, VINCI - AKTOR - STRABAG J/V
|
Participation in the design of the structures for a 58km long motorway, which includes 22 bridges, 6 tunnels and 50 smaller structures |
2012
Tripolis - Vytina - Ancient Olympia Motorway - Section: Deviation of Lagadia |
Client: MINISTRY OF P. W. & E. |
Participation (50%) of preliminary design of nine bridges and two tunnels. |
2011
Highway E80, Section Grvena Reka – Ciflik, Serbia |
Client:AKTOR S.A. |
Tender Consultation - Construction Consulting |
2010
Motorway Korinth - Patra - Pyrgos - Tsakona
|
Client:OLYMPIA J/V ASPROPYRGOS BRANCH
|
Design of technical works, twenty retaining walls and retaining structures in motorway Elefsina - Korinthos - Patras - Pyrgos - Tsakona, near the city of Xylokastro.
|
2009
Comarnic - Brasov Motorway - Romania |
Approved Project Budget: 2.000.000.000 €
Client:J/V VINCI CONCESSIONS - AKTOR S.A. |
Participation of Tender winning design
|
2008
Kostanta bypass motorway in Romania |
Approved Project Budget:-
Client:Romanian National Company of Motorways and National Roads/AKTOR S.A. |
Tender Design
|
2007
Pafos - Polis Motorway in Cyprus |
Client: Bilfinger Berger AG |
Tender Design |
|
New Railway Line Kalambaka-Kozani, Section Kalambaka-Dimitra |
Client: OSE S.A. |
|
Design of 3 bridges for the project POTA Romanos, in Messinia region, with steel composite deck |
Client: TEMES S.A. |
Design of of the road section "Zagora bypass, Phase Β’" of the National Road of the mount Pelion loop |
Client: MINISTRY OF P. W. & E./Prefecture Administrationof Magnesia |
2006
Design check of bridge Γ4 in chainage 18+700 - Section Panagia - Grevena (4.1.2s - 4.1.3s) |
Client: EGNATIA ODOS S.A. |
Consulting services to Egnatia Highway |
2005
High-speed Railway line ‘Athens - Thessaloniki’. Section Lianokladi - Domokos |
Approved Project Budget: 21.400.000 €
Client:ERGOSE S.A |
Participation (80%) in the structural design of 5 Railway bridges with the provision of seismic isolation. Construction methods utilized: traveling formwork, or incremental launching |
|